Our engineers work alongside the local team at an HDB pump station, commissioning the robot and supporting the acceptance process.
Our engineers arrived on site at an HDB pump station in Singapore together with the equipment, working alongside the local team for joint commissioning and full support through the acceptance process.
Singapore's municipal pipeline standards are strict: our engineers completed site entry inspection, wet well operation commissioning and safety compliance alignment on site, supporting the local supervisors through every acceptance metric.
From tropical climate adaptability to high-standard operational safety, both the Rottboter equipment and our team proved themselves on site, laying the foundation for continued cooperation in the Southeast Asian market.